Jefferson Park
|
|||||||||
Special Announcement This page is for phase two development of Jefferson
Park. Please see the following web page for phase one which is
funded mainly through the 2000 Pro Parks Levy and opened to the public in October 2010. |
February 2012
Save the date! Jefferson Park dedication is scheduled for Saturday July 14, 2012. Follow this website in the upcoming weeks for additional information.
The dedication includes:
Whether you are hearing about this for the first time or are already actively involved, we hope you join us!
| LOCATION |
3801 Beacon Ave S, Seattle WA 98108
|
| BUDGET |
$5,000,000 Parks and Green Spaces
Levy for further improvements to Jefferson Park* $1,000,000 Parks and Green Spaces Levy for a skatepark *$2,700,000 was advanced to the Phase One project allowing us to complete more, earlier. |
| SCHEDULE |
Planning: The schedule will
be
determined based on the timing of the funding. |
The Parks and Green Spaces Levy funds the further implementation of the Jefferson Park Master Plan.
Parks held a meeting on December 1, 2009 at Jefferson Community Center. At this meeting Parks provided information and gathered public input on the design for the following aspects in the park:
Parks received good bids for Phase One work which allows for additional
items to be integrated into Phase One work under the Pro Parks project.
The priority worksheets helped Parks determine the possible additions
for Phase One. For additional scope of items that will be pursued please
visit www.seattle.gov/parks/ProParks/projects/JeffersonPark.htm
Phase Two: As a separate project (time line, 2009-2011) Parks will be
looking at ways to improve Jefferson Play Field which will include synthetic
turf and lighting.
Phase Three: Another separate project (time line, 2010-2011) will include
the skateboard park (which has dedicated funding), basketball court,
and possibly additional parking at the community center.
Beacon Mountain is a community initiated project that is funded in part by the Levy. It is intended to be an ecologically oriented playscape situated in the future Jefferson Park site. The Mountain is envisioned as a climbable collection of slopes and boulders with on-grade slides and a spraypark sprinkler for summer cooling and fun. The project is under construction and we anticipate completion in early 2012.
Seattle City Light will be providing funding to construct picnic shelters that have solar panels as rooftops. The proposed locations for the shelters are very close to what is shown in master plan. One location is adjacent to Beacon Mountain, and the other adjacent to the sportsmeadow/lid. At the sportsmeadow lid we are proposing to split it in half so that it faces the fields and can still have roofs that face south.
The solar energy would go into Seattle City Light's electric grid. As with all grid-tied energy sources, the electrons will be used by the nearest load (meaning it will help power the park's lights, and maybe the community center). Essentially, this means less energy from traditional sources brought in to meet the local demand.
Jefferson Park Project Advisory Team
Beacon Mountain Committee Meeting 1/26/11
Jefferson Park Playfield is another park component that the Levy funds. The renovation includes creating a synthetic turf field with lighting. Schematic design has been approved by the user groups and parks. SDOT is currently reviewing a proposal for on-street parking adjacent to the playfield on 16th Ave. S. Construction Documents were submitted for permitting in 2010 with construction occurring in 2011. In March 2011, the project went to City Council for approval of the height of the light poles.
The Beacon Hill community participated in three planning meetings, held for the future developments at Jefferson Park, during the spring and summer 2010. They provided important input on the Jefferson Skatepark, Beacon Mountain and Jefferson Playfield. This input was used to shape the final schematic designs.
For additional information on the skatepark please visit http://seattle.gov/parks/projects/jefferson/skatepark.htm.
Community Meeting July 14, 2010
Community Meeting May 26, 2010 Community Meeting April 14, 2010 Community Meeting December 1, 2009 Community Meeting Information April 21, 2009Please open the attachments below to find a rendering of Phase 1 with callouts of possible improvements for Phase 2, the a project information summary, park element descriptions, option cost and meeting notes and a summary of priority worksheets.
Parks accepted additional comments for 3 weeks after the meeting. The window for accepting comments is now closed.
Translations
Chinese (Simplified)
» Meeting
Information ![]()
Chinese (Traditional)
» Meeting
Information ![]()
Korean
» Meeting
Information ![]()
Somali
» Meeting
Information ![]()
Spanish
» Meeting
Information ![]()
Tagalog
» Meeting
Information ![]()
Thai
» Meeting Information
![]()
Vietnamese
» Meeting
Information ![]()
*Note: To view a PDF, you must have Adobe Acrobat Reader. Download it for free at www.adobe.com.
City Light Community Solar Launch Event!
March 21, 2012 at 10 a.m.
This event commemorates the launch of the first Community Solar project and celebrate the founding members who made it possible. Please join City Light as they place the final solar panel at the southern picnic shelter and begin power generation!
Jefferson Park Dedication
Saturday July 14, 2012
Details coming soon!
Translations of previous meeting information from 2010 available under Community Participation below.
Andy Sheffer
800 Maynard Ave S,
Suite 300
Seattle, WA 98134
206-684-7041
andy.sheffer@seattle.gov
|
|
| Home | Partnerships | Park Board | Volunteer | FAQ | Parkways Blog |
|
|