Lincoln Park South Play Area Renovation

Updated: November 22, 2023

Fall 2023

The contract for Westcrest Play Area and Lincoln Park Play Areas has been awarded to LW Sunstrom. We anticipate play equipment to be available to ship in March 2024. As such, we will negotiate a start date with the contractor this fall. Construction will likely start in winter 2023/2024 to align with the availability of the play equipment.

The bid advertisement for construction for this project was posted on May 31, 2023. The bid set includes the play equipment replacement at Westcrest Park. Both projects will be constructed by the same contractor. The bid opening was June 21, 2023. 

Location

Lincoln Park, 8011 Fauntleroy Way SW, 98136

Budget

Seattle Park District provides $600,000 for planning, design and construction.

Schedule

Design: Spring 2021 - Spring 2022
Bid Advertisement/Award: Spring - Summer 2023
Construction: Winter - Spring 2024

Project Description

This improvement project is funded by the Seattle Park District. The play area renovation will update play equipment with play structures accessible to children of all ages and abilities. Additionally, accessibility improvements that meet the standards from the Americans with Disabilities Act (ADA) will be made throughout the play area.

Community Participation

Public Meeting 11/29/2017

Public Meeting 1/24/2018

Parks and Recreation

AP Diaz, Superintendent
Mailing Address: 100 Dexter Ave N, Seattle, WA, 98109
Phone: (206) 684-4075
Fax: (206) 615-1813
pks_info@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Parks and Recreation

Healthy People, Thriving Environment, Vibrant Community