2017 District 4 – Projects
2017 Your Voice, Your Choice: Parks and Street Elected Projects
- Gas Works Park Area Upgrades (Cost: $8,000, Total Votes: 262)
- Green Lake Way N and N 48th St (Cost: $90,000, Total Votes: 257)
- Densmore Ave N, Ashworth Ave N and N 40th St (Cost: $45,000, Total Votes: 228)
- 30th Ave NE and NE 55th St (Cost: $8,770, Total Votes: 193)
- 35th Ave NE and NE 80th St (Cost: $80,000, Total Votes: 188)
- “A” Street and NE 70th St (Cost: $45,000, Total Votes: 170)
- 35th Ave NE and NE 55th St (Cost: $2,500, Total Votes: 151)
- Magnuson Park Upgrades (Cost: $6,000, Total Votes: 141)
STREETS | Gas Works Park Area Upgrades
Crossing and Sight Line Upgrades
Project Description and Goals:
Pedestrian crossings on N Northlake Way and N 34th St, leading to playgrounds at Gasworks Park, are exposed to heavy volumes of traffic from people driving. The street also suffers from reduced sight distances due to overgrown landscape, a lack of signs indicating pedestrian crossings, and several blind corners. Installing a new marked crosswalk and updating signs enhances predictability, safety and accessibility for all travelers.
Project Solution(s):
Update crosswalk signs at various locations
Trim and maintain overgrown landscape on the east side of Gasworks Park and N Northlake Way
Install a new marked crosswalk on the west side of N 34th St and Burke Ave N
Construction was completed in March 2018.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | Green Lake Way N and N 48th St
Crossing Upgrades
Project Description and Goals:
High traffic volumes from people driving and pedestrians traveling to Green Lake Park, experience a complex intersection at Green Lake Way N and N 48th St. A new curb bulb and enhanced curb ramps, along with a refuge island effectively shortens crossing distances for pedestrians, and calms traffic.
Project Solution(s):
Install new curb bulb and ramp
Install new refuge island
Enhance existing curb ramps
Construction was completed in October 2019.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | Densmore Ave N, Ashworth Ave N and N 40th St
Crossing Upgrades
Project Description and Goals:
N 40th St experiences high volumes of traffic from travelers accessing key locations such as the University, Fremont and Wallingford business districts. Several intersections serve as key pedestrian crossings for people accessing Hamilton International Middle School and Wallingford Playfield. Installing new curb bulbs at Densmore Ave N and Ashworth Ave N shortens the crossing distance for pedestrians, enhances safety and effectively calms traffic. Intersection upgrades are also scheduled to happen at N 40th St and Bagley Ave N.
Project Solution(s):
Install new curb bulbs
Install new ADA compliant curb ramps
Construction was completed in June 2020.
Please check the Green Lake and Wallingford Paving & Multi-Modal Improvements project website for the latest updates.
Back to top.
Back to Your Voice, Your Choice landing page.
30th Ave NE and NE 55th St
Crossing Upgrade
Project Description and Goals:
NE 55th St experiences a high volume of people driving and lacks marked crosswalks for a 9-block stretch, despite an active retail area between 28th Ave NE and 30th Ave NE. Installing a new marked crosswalk enhances the connection to The University Village and safety for all travelers.
Project Solution(s):
Install a new marked crosswalk at the west crossing of NE 55th and 30th Ave NE
Construction was completed in March 2018.
Back to top.
Back to Your Voice, Your Choice landing page.
35th Ave NE and NE 80th St
Crossing Upgrade
Project Description and Goals:
The crosswalk at 35th Ave NE and NE 80th St would benefit from more visible signs or lighting to encourage slower driving speeds. Installing crossing beacons alerts drivers to pedestrians crossing and enhances safety and predictability for all travelers.
Project Solution(s):
Install crossing beacons on the north crossing of NE 80th St and 35th Ave NE
Construction was completed in November 2018.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | “A” Street and NE 70th St
Upgraded Pedestrian Access
Project Description and Goals:
Pedestrian access to Magnuson Park and residential housing within it, via a crossing from NE 70th St and Sand Point Way NE, is very limited. The crossing lacks ADA accessible curb ramps and an ADA compliant walkway between Sand Point Way NE and "A" St. Enhancing the walkway and repairing pavement on "A" St makes it easier for all pedestrians to get to the park.
Project Solution(s):
Enhance the existing walkway
Replace concrete pavement damaged by tree roots
Construction was completed in August 2019 as part of the redevelopment adjacent to the site.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | 35th Ave NE and NE 55th St
Speed Limit Sign Modifications
Project Description and Goals:
NE 55th St is a well-traveled street connecting people to the University District and surrounding neighborhoods. To make the street more comfortable for people driving and pedestrians we'll install new speed limit signs along NE 55th St and 35th Ave NE and relocate a speed limit sign on 35th Ave NE to caution people driving and enhance safety for all travelers.
Project Solution(s):
Relocate the existing southbound speed limit sign on 35th Ave NE, closer to NE 55th St
Install new speed limits sign on 35th Ave NE
Install new speed limit signs along NE 55th AVE NE
Construction was completed in May 2018.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | Magnuson Park Upgrades
Crossing and Signage Upgrades
Project Description and Goals:
Magnuson Park contains numerous streets, a high volume of people driving, residential housing, businesses, and playfields. The park has sidewalks and crossings in poor condition that need to be fixed. Installing and modifying existing crosswalks and signs within the Park enhances access, safety, and predictability.
Project Solution(s):
Install crosswalk signs at NE 65th St and Sports Field Drive
Replace a yield sign with a stop sign at 62nd Ave NE and NE 74th St
Replace a yield sign with a stop sign at NE 74th St and 63rd Ave NE
Construction was completed in April 2018.
Back to top.
Back to Your Voice, Your Choice landing page.
Materials
- District 4 Postcard Mailers (March 2018)