3rd Ave S and S Main St Bus Stop
አማርኛ • 繁体字 • 日本語 • 한국어 • af-Soomaali • Español • Tagalog • Tiếng việt
December 13, 2024
What's Happening Now?
Construction at 3rd Ave S and S Main St starts as soon as Friday, December 13, 2024 to create a more enjoyable experience for visitors and commuters. We will begin our work just south of the intersection of 3rd Avenue S and Yesler Way. You can read more details about the work below.
You can expect regular email updates while we work. If you or anyone in your social network want to receive these project updates via email, sign up to join our project listserv.
What are we doing? (Project Overview)
Phase 1 (Current Phase)
Construction will begin just south of the 3rd Ave and Yesler intersection. During this first phase of work, the contractor will install fiber conduit between S Washington St and Yesler Way, and stormwater infrastructure at the 3rd/Washington intersection. After the underground work is complete, the contractor will begin paving.
How will this affect you?
You should expect noise and dust from the work site. As early as 7am on Saturday, December 14, 2024, our crews will be sawcutting in order to prep for work.
What if I‘m driving to the area?
We aim to maintain driving access to the area throughout construction. To accomplish this, traffic will shift to the opposite side of the street where work is occurring.
What if I need to park in the area?
During the first phase of construction, parking along the east side of 3rd Avenue south of Yesler will be temporarily not allowed. We are doing this so that our crews can complete their work without delay and to keep people and their vehicles safe.
The bus layover zones on the southeast corner of S Washington St and 3rd Ave S and the northeast corner of S Main St and 3rd Ave S will now become a combination of loading and parking zones.. Signage will be installed to reflect this change in the next week.
We understand that all of these things are disruptive to the neighborhood and appreciate your patience. This transportation project will make the neighborhood look and function better. We're introducing better sidewalks, new trees and an art installation, improved lighting, a smoother street, and a revamped bus stop. These improvements not only keep buses reliable but make it easier and more pleasant to explore this vibrant neighborhood.
Our project will:
- Widen sidewalks
- Reconstruct pavement
- Repaint crosswalks
- Add pedestrian lighting
- Plant new trees
- We will also update the bus stop by -
- Adding new seating
- Installing real-time bus arrival information sign
- Installing an ORCA card reader
To learn more about what we are doing to encourage strolls to galleries, dining at local restaurants, and enjoying live music in a more pleasant environment, visit our 3rd Ave Improvements webpage.
What about traffic and parking?
Businesses in the neighborhood asked to keep two-way traffic so people driving can continue to go north and south. The updated design, makes room for this request by:
- Shifting parking on the east side of 3rd Ave S (in front of the art galleries and opposite the bus stop) to S Washington St and S Main St where buses currently park when they are not operating. People will also be able to use these locations for loading.
- At the corner of 3rd Ave S at S Washington St, in front of the Pioneer Square Clinic, there will be a large space for dropping off and picking up people.
Updated street design
When are we making these improvements? (Project Schedule)
The schedule below shows planned milestones:
- Dec 2024: Construction begins
*Construction timelines and milestones can change based on weather and other impacts. We will provide updates throughout construction to keep the public informed.
Funding
This project is possible through our partnership with King County Metro (KCM). KCM received federal grant money from the Federal Transit Authority (FTA), which funds many of the project's components. Other funding sources include the Seattle Transit Measure, Move Seattle Levy, King County Metro, Seattle City Light and Seattle Public Utilities.
Project Materials
Project materials will be shared as they are developed.
- Factsheet (January 2024)
- Construction Notice (Dec 2024)
Translation and Interpretation
If you need this information translated, please call (206) 900-8729
如果您需要此信息翻譯成中文 請致電 (206) 900-8729
Kung kailangan mo ang impormasyon na ito na nakasalin sa Tagalog mangyari lamang na tumawag sa (206) 900-8729
Si necesita traducir esta información al español, llame al (206) 900-8729
Odeeffannoon kun akka siif (206) 900-8729
Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi (206) 900-8729
የዚህን መረጃ ትርጉም ከፈለጉ፣ በዚህ ስልክ ቁጥር ይደውሉ: (206) 900-8729
ናይዚ ሓበሬታ ትርጉም እንተደሊኹም፣ በዚ ቁጽሪ ስልኪ ይድውሉ፡ (206) 900-8729
당신이 번역이 정보를 필요로하는 경우에, (206) 900-8729 ? 전화 해주십시오.